The Path to the Grid.
Unseen by visitors to the power house, a large-scale 35,000 kVA transformer forms part of each power unit.   The transformers feed the generated power via 50 kV cables into the distribution station, and from there into the grid of the three major customers. To ensure that the temperature of the machinery does not exceed 50°C when working at full capacity, a special heat exchanger has been built onto the transformer casing.